- 5 -
2. PREPARE THE INSTALLATION (CONT’D)
Cut-out the openings for duct (A) and power cable (B), in cabinet or wall, according to the direction of discharge
chosen.
See figures below.
NOTE: The duct opening width (A on figures below) is 10½”, centered.
3.1 Pull latch tabs and remove filters from the hood.
3. PREPARE THE HOOD
3.2 Remove the 5 screws retaining the bottom panel to the hood and
set aside. Pull out the bottom panel.
HO0030
3.3 Punch out the appropriate electrical knock-out hole.
Comments to this Manuals