Broan EW5836SS Installation Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
MODELS EW5830SS • EW5836SS
Page 4
Flush with
the ceiling
Center of
installation
Upper flue mounting
bracket slots
Ceiling
INSTALL THE HOOD
(Ducted Hoods Only)
DUCT LENGTH
DECORATIVE
FLUE
6” ROUND
STEEL DUCT
1. Center the flue mounting bracket over the hood location and
flush with the ceiling. Secure the upper flue bracket to the
wall using (2) 4mm x 38mm mounting screws. Note: Drywall
anchors may be required (not included).
2. Tighten the screws completely. Make sure that the bracket is
tight against the wall and ceiling.
3. Remove the protective plastic film covering the decorative
flue and the hood at this time.
4. Remove the grease filters by pulling down the metal latch tab
and tilting filters downward to remove.
5. Align the two outer keyhole slots on the hood with the
mounting screws that were partially tightened into the wall
framing. Ensure that hood is seated entirely on mounting
screws and that hood is level. Then tighten screws completely.
6. Install (2) 4mm x 38mm long screws into the holes inside the
hood and tighten them securely.
7. Reinstall grease filters by aligning rear filter tabs with slots
in the hood. Pull down the metal latch tab, push filters into
position and release. Make sure filters are securely engaged
after installation.
8. Measure and install steel ductwork to hood duct connector
and ductwork rough-in on ceiling or wall. Use duct tape to
make all joints secure and air tight.
9. Plug power cord into wall outlet.
C
L
Page view 3
1 2 3 4 5 6 7 8 9 ... 27 28

Comments to this Manuals

No comments