Broan E64000 Series User Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
6. CHOOSE THE OPENING(S) (INTERNALBLOWERHOODSONLY)
Remove the knockout for the chosen opening(s) (horizontal at the back of the hood or vertical on top).
See illustrations below.
VERTICAL DISCHARGE
installation
O
HR0021
HORIZONTAL DISCHARGE
NOTE: For ducted
only.
O
O O
_b
Punch out the appropriate electrical knockout hole on top (A) or back (B) of the
hood. Install the wire clamp (included in parts bag).
NOTE: For a non-ducted installation, punch out the back electrical knock-out (B).
B
7. HORIZONTAL DISCHARGE INSTALLATION (INTERNALBLOWER(S)ONLY)
All internal blower hoods are factory shipped with the blowers mounted for a vertical discharge configuration. For a horizontal
discharge configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the back panel of the
hood. The procedure below applies for one or two motors.
Unplug the blower.
Using a 5/16" socket, remove all
blower mounting screws from the
inner top of the hood. Keep the
screws for further use.
-9-
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 47 48

Comments to this Manuals

No comments