Broan BCDF136SS User's Guide Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
INSTALLATION MANUAL
INSTALLATION
13
FRAMED CABINET
7/64”
XY
Z
Refer to the marking on the brackets to determine the correct installation side and
orientation.
Mate the corresponding bracket to the cabinet side frame, while placing rear end
of bracket against the wall. Use a pencil to mark 3 holes (there are 6 holes but only
3 are necessary).
Remove the bracket. Using a 7/64” drill bit, drill 3 holes where marked.
Assemble the bracket to the side frame using a Phillips screwdriver and 3 provided
no. 8 x 5/8” wood screws. Repeat for the other side frame.
7 ] Install the proper installation brackets according to the type of cabinet (framed or frameless).
See below.
4 ] Drill a 1/8” dia. pilot hole for house wiring, at A location on template.
5 ] Use a sharp pencil or 1/8” drill bit to mark the locations for the appropriate duct access
holes (16 locations for 7” round duct, or 4 corner locations for rectangular duct). Remove the
template.
6 ] Draw the border for the exhaust ducting by linking its marks (16 for round duct and 4 for
rectangular duct), then cut the opening in the cabinet bottom (vertical exhaust) or in the wall
(horizontal exhaust). Drill the house wiring hole by using a 1½” hole saw centered with the
pilot hole previously made in 4.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 23 24

Comments to this Manuals

No comments