Broan 61000 Series User Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 10
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
- 5 -
CONNECT DUCTWORK
Ductfree Configuration
1. Use screws and wall anchors (sup-
plied) to secure the upper bracket
to wall and ceiling as shown.
2. Turn upper flue section upside
down so air vents are at the top.
Slide upper flue section into lower
flue section.
3. Snap the plastic duct collar into the
hole in the bottom of the ducfree ple-
num. Connect the ductfree plenum
to the upper flue section with (4) flat-
head screws (supplied).
4. Measure the distance from the top
of the discharge collar to the ceil-
ing. Cut a length of 6" round steel
duct 6" shorter than this dimension.
5. Fit duct section over the plastic duct
collar. For best fit, make sure duct
seam is toward the front.
6. Set duct/flue assembly on hood with top tilted away from wall. Reach around flue
to engage bottom of duct with discharge collar on hood. Tilt flue up against wall.
Upper flue section can be cut to length if necessary.
7. Raise upper flue section and screw it to upper bracket with (2) screws (supplied).
Screw lower flue section to hood with screws (supplied).
MEASURE
UPPER
FLUE SECTION
DUCTFREE
PLENUM
PLASTIC
DUCT COLLAR
AIR
VENTS
(in upper flue section)
UPPER
BRACKET
LOWER
FLUE SECTION
6" ROUND
STEEL DUCT
DISCHARGE
COLLAR
DUCT
SEAM
DUCTFREE FILTER
INSTALLATION
1. Purchase a ductfree filter kit (part no.
????) from your dealer.
2. Screw the plastic mounting brackets to
the blower inlet.
3. Position the filters over the mounting
brackets. Rotate mounting brackets to
lock filters in place.
Page view 4
1 2 3 4 5 6 7 8 9 10

Comments to this Manuals

No comments