Page 4
ALLURE
®
QS2 SERIES
RANGE HOOD
PREPARE THE HOOD
13 3¼” x 10” Ducted Discharge Only: Remove Tape from damper
flap and attach Damper/Duct Connector over knockout
opening with screws removed in Step 4 under “PREPARE
THE HOOD”. Make sure damper Pivot is nearest to Top/Back
Edge of hood.
DAMPER/
DUCT
CONNECTOR
(Vertical
discharge
position shown)
TAPE
UP TO 1”
SIDE-TO-SIDE
ADJUSTMENT
PIVOT
TOP/BACK
EDGE
NOTE Damper/Duct Connector can be installed up to 1-inch
on either side of hood center - to accomodate off-center
ductwork. In extreme off-center installations, one end of
the duct connector may need to be trimmed to clear the
electrical cable clamp.
PREPARE THE HOOD
11 Remove appropriate Duct Knockout(s) from top or back of
hood.
REAR
RECTANGULAR
DUCT KNOCKOUT
(Remove for 3¼” x 10”
Horizontal Discharge)
TOP RECTANGULAR
DUCT KNOCKOUT
(Remove for 3¼” x 10”
Vertical
12 Horizontal Discharge Only: Remove the Plate in front of the
horizontal discharge knockout. Cut the Ties, lift plate out,
and discard plate. DO NOT REMOVE the Metal Strip held
in place with two Screws.
TIES
PLATE
METAL STRIP
SCREW
10 Non-Ducted Installations Only: Require a Performance Ring
to be attached to the blower wheel.
To install ring:
1. Remove the Blower Wheel by rocking it side to side and
applying a slight force to pull wheel from motor. Remove
Retaining Ring if necessary.
2. Slide the ring onto the Small Diameter End of the wheel
and down to the Stop Edge of the wheel.
3. Reassemble wheel to motor. Make sure Tab on wheel fits
into one of the Motor Slots.
4. Push wheel down until it is locked in place.
5. Check that wheel is properly positioned as shown. Press
Sections into place if necessary. Make sure wheel turns
freely.
BLOWER
WHEEL
TA B
SECTIONS
SMALL DIAMETER
END
STOP
EDGE
RING
MOTOR
SLOTS
RETAINING
RING
¼
»
Comments to this Manuals